Internal bridge at Court of Justice

The brief for this project was to create an internal connection between the main lift area and the upper Level in the existing Law Courts. This connection would also double up a waiting area outside of the Court Hall. In view of this a lightweight steel platform was installed at the required level. Finishing elements borrowed from existing elements found in the space, such as the circular timber windows and the elaborately designed iron railings.